LOAD - AVERAGE & PEAK
Average load 337 MW - Peak load 755 MW
Base peak 528 MW - Total 2955 GWh
Base 2535 GWh + Flex EV/WH/HP 420 GWh + Battery charge 107 GWh
Peak hour: Feb 01, 06 PM Atlantic
DR operating limit: 635 MW (Base peak x 1.20) - DR deferred EV 0 MWh, WH 3 MWh. On the coldest day DR is in peak-shaving mode: EV / hot-water / battery charging pause, battery discharges. HP heating and EV must-charge are never deferred.
DEMAND RESPONSE - PEAK SHAVING
Operating limit 635 MW (Base peak x 1.20)
DR deferred EV 0 MWh, WH 3 MWh to later, lower-load hours
Most hours DR is in normal mode: EV, hot water, and battery charge on surplus. On the coldest day DR is in peak-shaving mode: EV / hot-water / battery charging pause, battery discharges. HP heating and EV must-charge are never deferred. Transmission and distribution cannot carry Base + HP + EV + WH + battery charging all at once.
SUPPLY MIX - HOW TOTAL WAS MET
Nuclear Imports: 235 GWh (7.9%)
Local Wind+Solar+Battery: 2311 GWh (78.2%) = Total - Nuclear - Other - Backup
Other Imports: 410 GWh (13.9%) - mix unclear, not counted as clean
Total Imports: 644 GWh (21.8%) - Backup: 0.0 GWh
Clean = Local + Nuclear = 2545 GWh (86.1%) = Total - Other - Backup
RENEWABLE GENERATION
Wind: 800 MW x 42.1% CF = 2953 GWh (100% of load)
Solar: 400 MW x 13.2% CF = 461 GWh (16% of load)
Total RE gen: 3415 GWh (116% of load)
Exports 1084 GWh, Curtailed 103 GWh
BATTERY
200 MW / 800 MWh (4.0h)
Charged 107 GWh, Discharged 96 GWh, Loss 11 GWh, Cycles 120
EV FLEET - 24 SUB-CLASSES (V34) - PEI-ANCHORED - 6 DISTANCES x 4 VEHICLES
30,000 total = 2,800 already in Base +
27,200 new (only new are in Flex)
Total
92.7 GWh/yr (new only), Peak
127.2 MW, Avg SOC
68%Modelled average:
3410 kWh/yr per new EV,
222 Wh/km (from the run - total EV energy / new EVs, / 15,330 km/yr, PEI stat 15,300)
Gasoline displaced
37.5 ML/yr ~
86 kt CO2/yr avoided (same 24-class matrix; car 7.5, SUV 9.5, truck 12.5, van 11.0 L/100km x 2.3 kg CO2/L). Diesel not counted - some trucks are diesel, so this is conservative.
EV methodology - click to expand
24 sub-classes = 6 distances x 4 vehicles, independent - a 40 km/day driver can be in a truck, a 160 km/day driver can be in a car. Distances: 5% @ 160, 10% @ 120, 10% @ 70, 15% @ 40, 30% @ 20, 30% @ 10 km/day = 42.0 km/day = 15,330 km/yr (PEI: 15,300, NRCan). Vehicles, same mix at every distance: 55% SUV (172 Wh/km), 20% car (155), 20% pickup (245), 5% van (210). PEI tilt: Canada fleet SUV 41.9/Car 35.0/Pickup 16.8/Van 6.3; new sales SUV 62.9/Pickup ~20/Car ~12; PEI is more rural/truck-heavy, so trucks 20%. PEI does NOT publish a body-type split - this is the honest gap, flagged to replace when it does. Efficiency hourly from Charlottetown temp that hour, Leaf curve for shape, scaled per vehicle from EPA. Km-weighted fleet 1.19x Leaf. Charger loss x1.10. SOC 30% -> 80% (Dahn, Dalhousie). BEV/PHEV: PEI 2025 ZEVs are 40.5% PHEV (810/1,999); PHEVs drive 60% of km on electricity. Visitor uplift: 1.71M visitors, ~1M bridge vehicles/yr, +4% May, +8% Jun, +12% Jul/Aug, +8% Sep, +4% Oct - shown as ev_visitor_MW. Timer 11:30pm-6:30am Atlantic, Smart any hour. No brands, no DC fast charging, no V2G.
HEAT PUMPS
50,000 homes total = 20,000 already in Base + 30,000 new (only new are in Flex)
Electricity 188.9 GWh/yr (new only), Thermal 525.0 GWh/yr, Avg COP 2.78
Heat delivered displaces fossil heat (oil / propane / biomass) - not split here, because PEI's remaining fossil heat mix is small and mixed, and this model does not track which fossil fuel each home used before.
HOT WATER
35,000 tanks total = 25,000 already in Base + 10,000 new (only new are in Flex)
Domestic 3000 kWh/yr/home, Commercial 8000 kWh/yr/unit
Tank 6.3 kWh, Element 4.5 kW, SOC 0.40-0.85 = 2.8 kWh flex (0.45 x 6.3 kWh tank)
ECONOMICS (2024 CAD)
CAPEX: Wind 800 MW x $2.25M/MW = $1800M, Solar 400 MW x $1.80M/MW = $720M, Battery 200 MW / 800 MWh = $370M
Total CAPEX $2890M
Annualized (CRF 6% - 30yr wind/solar, 20yr battery): Wind $172.1M/yr = LCOE $58/MWh (5.8 c/kWh) - Solar $59.7M/yr = LCOE $129/MWh (12.9 c/kWh) - Battery $32.3M/yr = $336/MWh delivered
Nuclear Imports $26.5M/yr at $113/MWh - Other Imports $32.8M/yr at $80/MWh
Gross cost $323.4M/yr / 2955 GWh = Avg 109 $/MWh (10.9 c/kWh)
Exports sold 1084 GWh x $50/MWh = $54.2M revenue
Net cost to islanders $269.2M/yr = $323.4M gross - $54.2M export sales
Net $91 $/MWh (9.1 c/kWh) after export sales - this is what islanders effectively pay
WEATHER - Charlottetown 2025 (MERRA-2 / actual)
Mean 7.4deg C, Min -15.7deg C, Max 30.5deg C, HDD18 4062, CDD21 53
Precip 846 mm total, Snow 2426 h >2 kg/m2, Max snow 44.6 kg/m2, Hours <-10deg C 259, Hours <-15deg C 6
Snow derate: solar to 20% when snow >2 kg/m2