Wind 500 MWSolar 250 MWBattery 100 MW (4h)2030
Clean 80.3% · Local 70.3% · Net 86 $/MWh (8.6 c/kWh) after export sales (Gross 95)
Cables to New Brunswick: Nuclear 29 MW · Other Imports 300 MW · Exports 210 MW.
Details Nuclear outage 672 h · DR limit 540 MW (Base peak x 1.20) · West Cape 90 MW for export not counted; total wind would be 1,290 MW. See Technical Report.

Electrify PEI

What happens in 2030?

This page is one scenario, not a prediction. It shows what PEI's grid would do, hour by hour, with the wind, solar, and battery in this scenario.

What to look for: The coldest evening - does the peak stay under control? The sunny, windy midday in summer - where does the extra go? And the battery - does it discharge at the peak, and charge when there is surplus?

Charts: All times Atlantic. Pinch to zoom, tap the house to reset.

2030

Clean 80.3%  -  Local 70.3%  -  Net 86 $/MWh after export sales (Gross 95)

LOAD - AVERAGE & PEAK
Average load 269 MW  -  Peak load 496 MW
Base peak 449 MW  -  Total 2356 GWh
Base 2152 GWh + Flex EV/WH/HP 204 GWh + Battery charge 56 GWh
Peak hour: Feb 01, 07 PM Atlantic
DR operating limit: 540 MW (Base peak x 1.20) - DR deferred EV 0 MWh, WH 0 MWh. On the coldest day DR is in peak-shaving mode: EV / hot-water / battery charging pause, battery discharges. HP heating and EV must-charge are never deferred.
DEMAND RESPONSE - PEAK SHAVING
Operating limit 540 MW (Base peak x 1.20)
DR deferred EV 0 MWh, WH 0 MWh to later, lower-load hours
Most hours DR is in normal mode: EV, hot water, and battery charge on surplus. On the coldest day DR is in peak-shaving mode: EV / hot-water / battery charging pause, battery discharges. HP heating and EV must-charge are never deferred. Transmission and distribution cannot carry Base + HP + EV + WH + battery charging all at once.
SUPPLY MIX - HOW TOTAL WAS MET
Nuclear Imports: 235 GWh (10.0%)
Local Wind+Solar+Battery: 1657 GWh (70.3%) = Total - Nuclear - Other - Backup
Other Imports: 462 GWh (19.6%) - mix unclear, not counted as clean
Total Imports: 696 GWh (29.6%)  -  Backup: 3.2 GWh
Clean = Local + Nuclear = 1891 GWh (80.3%) = Total - Other - Backup
RENEWABLE GENERATION
Wind: 500 MW x 42.1% CF = 1846 GWh (78% of load)
Solar: 250 MW x 13.2% CF = 288 GWh (12% of load)
Total RE gen: 2134 GWh (91% of load)
Exports 454 GWh, Curtailed 67 GWh
BATTERY
100 MW / 400 MWh (4.0h)
Charged 56 GWh, Discharged 50 GWh, Loss 5 GWh, Cycles 126
EV FLEET - 24 SUB-CLASSES (V34) - PEI-ANCHORED - 6 DISTANCES x 4 VEHICLES
15,000 total = 2,800 already in Base + 12,200 new (only new are in Flex)
Total 39.8 GWh/yr (new only), Peak 63.8 MW, Avg SOC 64%
Modelled average: 3261 kWh/yr per new EV, 213 Wh/km (from the run - total EV energy / new EVs, / 15,330 km/yr, PEI stat 15,300)
Gasoline displaced 16.1 ML/yr ~ 37 kt CO2/yr avoided (same 24-class matrix; car 7.5, SUV 9.5, truck 12.5, van 11.0 L/100km x 2.3 kg CO2/L). Diesel not counted - some trucks are diesel, so this is conservative.
EV methodology - click to expand
24 sub-classes = 6 distances x 4 vehicles, independent - a 40 km/day driver can be in a truck, a 160 km/day driver can be in a car. Distances: 5% @ 160, 10% @ 120, 10% @ 70, 15% @ 40, 30% @ 20, 30% @ 10 km/day = 42.0 km/day = 15,330 km/yr (PEI: 15,300, NRCan). Vehicles, same mix at every distance: 55% SUV (172 Wh/km), 20% car (155), 20% pickup (245), 5% van (210). PEI tilt: Canada fleet SUV 41.9/Car 35.0/Pickup 16.8/Van 6.3; new sales SUV 62.9/Pickup ~20/Car ~12; PEI is more rural/truck-heavy, so trucks 20%. PEI does NOT publish a body-type split - this is the honest gap, flagged to replace when it does. Efficiency hourly from Charlottetown temp that hour, Leaf curve for shape, scaled per vehicle from EPA. Km-weighted fleet 1.19x Leaf. Charger loss x1.10. SOC 30% -> 80% (Dahn, Dalhousie). BEV/PHEV: PEI 2025 ZEVs are 40.5% PHEV (810/1,999); PHEVs drive 60% of km on electricity. Visitor uplift: 1.71M visitors, ~1M bridge vehicles/yr, +4% May, +8% Jun, +12% Jul/Aug, +8% Sep, +4% Oct - shown as ev_visitor_MW. Timer 11:30pm-6:30am Atlantic, Smart any hour. No brands, no DC fast charging, no V2G.
HEAT PUMPS
35,000 homes total = 20,000 already in Base + 15,000 new (only new are in Flex)
Electricity 94.6 GWh/yr (new only), Thermal 262.5 GWh/yr, Avg COP 2.78
Heat delivered displaces fossil heat (oil / propane / biomass) - not split here, because PEI's remaining fossil heat mix is small and mixed, and this model does not track which fossil fuel each home used before.
HOT WATER
30,000 tanks total = 25,000 already in Base + 5,000 new (only new are in Flex)
Domestic 3000 kWh/yr/home, Commercial 8000 kWh/yr/unit
Tank 6.3 kWh, Element 4.5 kW, SOC 0.40-0.85 = 2.8 kWh flex (0.45 x 6.3 kWh tank)
ECONOMICS (2024 CAD)
CAPEX: Wind 500 MW x $2.25M/MW = $1125M, Solar 250 MW x $1.80M/MW = $450M, Battery 100 MW / 400 MWh = $185M
Total CAPEX $1760M
Annualized (CRF 6% - 30yr wind/solar, 20yr battery): Wind $107.6M/yr = LCOE $58/MWh (5.8 c/kWh) - Solar $37.3M/yr = LCOE $129/MWh (12.9 c/kWh) - Battery $16.1M/yr = $320/MWh delivered
Nuclear Imports $26.5M/yr at $113/MWh - Other Imports $37.0M/yr at $80/MWh
Gross cost $224.9M/yr / 2356 GWh = Avg 95 $/MWh (9.5 c/kWh)
Exports sold 454 GWh x $50/MWh = $22.7M revenue
Net cost to islanders $202.2M/yr = $224.9M gross - $22.7M export sales
Net $86 $/MWh (8.6 c/kWh) after export sales - this is what islanders effectively pay
WEATHER - Charlottetown 2025 (MERRA-2 / actual)
Mean 7.4deg C, Min -15.7deg C, Max 30.5deg C, HDD18 4062, CDD21 53
Precip 846 mm total, Snow 2426 h >2 kg/m2, Max snow 44.6 kg/m2, Hours <-10deg C 259, Hours <-15deg C 6
Snow derate: solar to 20% when snow >2 kg/m2

Powered by PEI-Dispatch - Hourly electricity dispatch model for PEI. Back to Electrify PEI home